Process

From first enquiry to dispatched pallet — a documented, predictable path.

Most projects complete in 15–20 days working days once a PO is confirmed. Below is the full path, plus what we layer on for export houses, D2C brands and network-marketing companies.

  1. 01

    Enquiry & brief

    Send us your product category, target volume, launch date and any reference benchmarks. We respond inside 24 hours with feasibility and indicative pricing.

  2. 02

    Formulation & sampling

    Choose from 50+ existing formulations or commission a custom formula. Lab samples typically ready in 7–10 days. Up to two reformulation rounds included.

  3. 03

    Packaging selection

    Standard packs from our catalogue or custom — bottles, jars, tubes, sachets, bars. Primary and secondary packaging, label artwork QC included.

  4. 04

    Quotation & PO

    Transparent costing on RM, packaging, labelling, freight and taxes. 50% advance, 50% before dispatch — clear B2B terms.

  5. 05

    Manufacturing & QC

    Batch size 100kg–1,000kg per SKU. In-line pH, viscosity, organoleptic and microbial checks. Every batch receives a COA, MSDS and BMR.

  6. 06

    Packing & dispatch

    Primary fill, secondary cartoning, batch coding (MFG/EXP/MRP/batch no.). Pallet-ready dispatch with full documentation pack for domestic or export.

Dedicated lanes

Tailored to how you actually go to market.

For export houses

  • INCI-compliant ingredient lists
  • Country-specific labelling support
  • Stability test reports
  • Allergen declarations
  • Heavy-metal & microbial reports on request
  • Carton marking per Incoterm

For D2C brands

  • Pilot batch at 100-piece MOQ
  • Scale to 1,000 kg without reformulation
  • Performance-marketing-ready hero SKUs
  • Quick-turn label and packaging revisions
  • Forecast-based repeat scheduling

For MLM & network marketing

  • Strict batch-to-batch consistency
  • Multi-state label compliance support
  • Reproducible fragrance and colour matching
  • Predictable monthly supply
  • Bundled-kit packing options

Transparent B2B terms

Minimum order
100 pieces
Batch size
100 kg – 1,000 kg per SKU
Lead time
15–20 days working days
Payment
50% advance · 50% before dispatch
Sample turnaround
7–10 days after brief finalisation
GST
Applicable per current cosmetic tax slab

Need a private capability deck?

We share a detailed PDF with facility photos, equipment list, formulation library index and certification copies on request.

Download capability deck